Accommodation While Renovating: Staying On Your Own Section

November 1, 2026

The quote's signed and the builder has a start date. Then comes the question nobody budgets enough time for: where are we going to live?

The usual options aren't great. A short-term rental across town gets expensive fast and pulls the kids away from their routine. Staying with family is generous of them, but it wears thin after a few weeks. And living in the house while it's being pulled apart means dust in everything and no kitchen.

There's another option many people don’t consider: stay on your own section, in a cabin, while the work happens next door.

Why staying on site helps

  • You're there when questions come up. Builders often need a quick decision on a tile, a power point position or a problem they've found behind the wall. Being 20 metres away beats a phone call from across town.
  • Nothing else changes. Same school run, same commute, same neighbours.
  • You're not paying for a second house. You keep paying your mortgage or rent, and the cabin hire replaces what you'd otherwise spend on short-term accommodation.
  • You can keep an eye on the place. A building site with nobody home can attract the wrong kind of attention, especially once tools and materials are lying around.

One thing to know upfront: pets can't go inside the cabins. If the dog normally sleeps inside, you'll need a plan for that.

Which cabin you need depends on the job

Start with how much of the house you'll still be able to use.

  • Part of the house still works: if the bathroom and kitchen stay usable and you're only losing bedrooms, a sleepout like the Tikitapu or Karāpiro may be all you need.
  • The kitchen or bathroom is out of action: you'll want a self-contained cabin. The Rotomā has a kitchenette and ensuite and suits a couple.
  • The whole family is moving out of the house: the Taupō is our largest cabin and can be divided into two rooms, so the adults and kids can have separate sleeping areas. For bigger families, talk to us about pairing a self-contained cabin with a sleepout.

Talk to your builder before you book

Your section is about to become a building site, and your builder will have opinions about where things go. Ask them early:

  • Where will the scaffolding, skip bin and material drop-offs be?
  • Which parts of the section do their trucks need to get through?
  • Are there site safety rules that affect where you can live and walk?

Then pick a spot that's out of the way of all of that. It's also smart to have the cabin delivered before the work starts. Our truck needs a path at least 3.9m wide and 3.6m high, and once fences, scaffolding and stacks of timber go up, that path can disappear.

The catch most people miss: power and water

Our cabins connect to the house. The power lead plugs into a standard power point, and the self-contained cabins connect to an outside tap for water. That's normally simple. During a renovation, it might not be.

  • Power: electricians often turn off circuits or replace the switchboard partway through a job. If the cabin is plugged into a circuit that's switched off, you lose lights, heating and the fridge. Ask your electrician to make sure the cabin is connected to a supply that stays live for the whole job, such as a temporary builder's supply.
  • Water: if the plumber needs to shut off the mains, the cabin's water goes off too. The hot water califont also needs a minimum water pressure (30kPa with a flow of 5 litres a minute) to work, so check the outside tap you'll be using still delivers that.
  • Hot water gas: the califont runs on two 9kg gas bottles, which you supply. Get them filled before move-in day.

A five-minute chat with your electrician and plumber at the start saves a cold shower halfway through.

Plan for the job taking longer

Renovations run over. Weather, material delays and surprises behind the walls all add weeks. Our minimum hire is three months, which covers most kitchen and bathroom jobs, but bigger projects can take six months or more. Be realistic about your timeline, and if it changes, talk to us early.

Watch the calendar too. Our office closes from 19 December to 12 January, and plenty of builders stop for the same stretch. If you're planning a summer start, book well ahead.

If it's an insurance job

If your house is being repaired after a flood, fire or storm, check your house insurance policy. Many include cover for temporary accommodation while your home can't be lived in. Talk to your insurer before you book anything, so you know what they'll pay for and what paperwork they need.

What it costs

For self-contained cabins, the Rotomā is $245 a week on a three-month hire and the Taupō $300 a week, with lower weekly rates on longer terms. There's a $650 bond, and delivery is priced on your location. The sleepouts cost less. Our pricing guide covers every cabin and term.

When you compare, look at the real cost of the alternatives: the weekly rent on a short-term place, the extra fuel and time on the road, and any furniture storage you'd need either way.

Making a small space work for a few months

  • Bring less than you think. Store most of your things in the garage or a storage unit. A small space with only what you need feels much bigger.
  • Keep cooking simple. A slow cooker or air fryer does most of the work. Just don't run them at the same time as the heater.
  • Face the door away from the work. It cuts down the dust coming in and gives you a bit of a view that isn't a building site.
  • Expect early starts. Builders often arrive at 7am. Earplugs are cheap.

Living next to your own renovation isn't glamorous. But watching it come together from across the lawn is a lot easier than driving over after work to see what's changed.